Skip to main content

Frades I / Venda Nova II Hydro Power Plant

header_frades_i_-_venda-nova.png

Frades I / Venda Nova II Hydro Power Plant

The Hídrica de Frades I / Venda Nova II Hydro Power Plant, located in Vieira do Minho, started operating in 2005.

Technical Information

  • Start of Operations: 2005
  • Installed Power: 191,4 MW
  • Water Course: Rabagão
  • Average Annual Production: 220 GWh
  • Location (GPS Coordinates)41°41'34''N, 8°1'40''W
  • Group Type: Reversible
  • Total Storage: N/A
1744367700
Carbon impact evaluator
This web page produces:
per Byte
0.000
g CO2
per Visit
0.000
g CO2