
Frades I / Venda Nova II Hydro Power Plant
The Hídrica de Frades I / Venda Nova II Hydro Power Plant, located in Vieira do Minho, started operating in 2005.
Technical Information
- Start of Operations: 2005
- Installed Power: 191,4 MW
- Water Course: Rabagão
- Average Annual Production: 220 GWh
- Location (GPS Coordinates): 41°41'34''N, 8°1'40''W
- Group Type: Reversible
- Total Storage: N/A
1744367700