
Rei de Moinhos Hydro Power Plant
The Rei de Moinhos Hydro Power Plant, located in Meda de Mouros, started operating in 1927.
Technical Information
- Start of Operations: 1927
- Installed Power: 0,8 MW
- Water Course: Alva
- Average Annual Production: 2,2 GWh
- Location (GPS Coordinates): 40°15'34''N, 8°1'50''W
- Group Type: Simple
- Total Storage: 0,01 hm³
1744287569