Installed capacity of 180-megawatts
Project overview
Junction 51 Solar would be located in Bollinger County, Missouri - near Patton and Cape Girardeau. The solar site is currently in development with preliminary plans to commence onsite work in the second half of 2027 and reach operations by the end of 2028.
Economic benefits
Junction 51 Solar yields significantly in the form of payments to landowners, local spending, and annual community investment.
Millions of dollars
Capital investment
Approximately $26 million
Would be paid to local governments
$45+ million
Would be paid to landowners
Millions of dollars
Would be spent locally
Job creation
Hundreds of construction jobs and multiple permanent jobs would be created
Committed to being a good neighbor
Junction 51 Solar will be a long-term partner of the surrounding community for decades to come. Our commitment extends beyond generating renewable energy—we aim to build strong, supportive relationships in the community through thoughtful donations and educational outreach initiatives.
Renewable energy technology

Energy security
Energy security
Power generated at Junction 51 Solar would support the state of Missouri’s electric grid.

Solar as a neighbor
Solar as a neighbor
Solar projects are essentially silent neighbors designed to capture light while not producing glare.

Solar panel technology
Solar panel technology
Solar panels contain no liquids and do not pose a risk to the environment or human health.

228 million gallons of water saved each year
Junction 51 Solar would save more than 228 million gallons of water each year and would prevent the air pollution that causes smog and acid rain.