Pateiro Hydropower Plant

The Pateiro hydroelectric power plant, located in Trinta, began operations in 1899.

Technical Information

  • Start of operations: 1899
  • Installed capacity: 0.3 MW
  • Watercourse: Mondego
  • Average annual production: 0.1 GWh
  • Location (GPS coordinates): 40°30'43''N, 7°21'53''W
  • Type of group: Simple
  • Total storage: N/A