
Pateiro Hydropower Plant
The Pateiro hydroelectric power plant, located in Trinta, began operations in 1899.
Technical Information
- Start of operations: 1899
- Installed capacity: 0.3 MW
- Watercourse: Mondego
- Average annual production: 0.1 GWh
- Location (GPS coordinates): 40°30'43''N, 7°21'53''W
- Type of group: Simple
- Total storage: N/A
1744285734