Skip to main content

Wastewater

efluentes_liquidos_2.jpg

Wastewater

Wastewater

We periodically monitor the quality of the effluents, in accordance with the provisions of the respective environmental licences and legislation in force.

In the particular case of Soto de Ribera, the discharge medium is the River Nalón, which is declared a Site of Community Interest. Its effluents are subject to temperature conditions and physical-chemical parameters that guarantee that the receiving medium is not altered.

The thermal impact of the cooling water at EDP's thermoelectric power stations is periodically monitored in accordance with the specific characteristics of each power station and the respective environmental permits. Aerial thermography and the measurements carried out enable compliance with the established temperature limits to be verified.
The thermal impact of the cooling water at EDP's thermoelectric power stations is periodically monitored, in accordance with the specific characteristics of each power station and the respective environmental licenses. Aerial thermography and the measurements carried out make it possible to verify compliance with the established temperature limits.

Consult the environmental documentation

Wastewater 2023
Document
PDF . 36.64 KB
Wastewater 2022
Document
PDF . 23.62 KB
Wastewater 2021
Document
PDF . 131.23 KB
Wastewater 2020
Document
PDF . 53.60 KB

We work for sustainable lives

header-economia-circ.jpg

Circular Economy

Increasing the value of natural resources
Know more
Header-Biodiversidade_0.jpg

Biodiversity

Protecting nature is ensuring the future
Keep up
wind-float-transicao-energetica.jpg

Climate change

Fighting climate change is an assumed commitment
Know more
IMG_Header.jpg

Protect the environment

We care for our planet and contribute to a regenerative world
Know how
1747991944
Carbon impact evaluator
This web page produces:
per Byte
0.000
g CO2
per Visit
0.000
g CO2